★ 負責已建橋梁施工監控、成橋荷載試驗項目情況
(1)福銀高速新九江長江公路大橋(主跨70+75+84+818+233.5+124.5m雙塔雙索面混合梁斜拉橋)施工監控,該橋為江西第一橋,其跨徑位居已建和在建同類橋梁世界第6名,2012.3~2013.10,現場結構分析負責人。(已建)
(2)浙江省衢州市常山大橋(65+108+65m預應力混凝土矮塔斜拉橋)、紫港大橋(40+65+40m預應力混凝土連續梁橋)施工監控及成橋荷載試驗,項目負責人。(已建)
(3)鄭州至登封快速通道改建工程朝陽溝水庫特大橋(主跨58+118+188+108m波形鋼腹闆PC部分斜拉橋,該橋為國内最大跨度的波形鋼腹闆斜拉橋)施工安全風險評估,王家莊水庫大橋(主跨60+100+60m變截面連續剛構箱梁)施工安全風險評估,2013.8~2013.11,第一負責人。(已建)
(4)黑龍江省雙鴨山雙勝路安邦河斜拉橋(70+70m獨塔單索面寬箱梁斜拉橋)施工監控項目及成橋荷載試驗,2012.5~2013.9,第一負責人。(已建)
(5)黑龍江集賢縣福利鎮至雙鴨山市尖山區安邦鄉道路及配套建設工程(北外環路2标)K2+220安邦河大橋成橋荷載試驗,2015.3~2015.4,第一負責人。(已建)
(6)黑龍江省道依饒公路雙鴨山至集賢段K0+458.86嶺東高架橋成橋荷載試驗,2016.6~2016.8,第一負責人。(已建)
(7)廣東省東莞市麻湧二橋(46+80+46m預應力混凝土連續剛構橋)施工監控,2011.8~2012.1,第一負責人。(已建)
(8)黑河市大黑河島大角度V撐蝶形拱式連續梁橋(51+53+53m預應力混凝土連續梁橋)施工監控,2010.5~2010.11,第一負責人。(已建)
(9)哈爾濱特大橋跨環城高速公路連續梁施工監控(48+80+48m鐵路連續梁橋),2016.5~2017.4,第一負責人。(已建)
(10)哈爾濱特大橋跨水泥路連續梁施工監控(48+80+48m鐵路連續梁橋),2017.4~2017.9,第一負責人。(在建)
(11)塘口南端疏解線特大橋連續梁施工監控(35.6+56+35.6m鐵路連續梁橋),2017.4~2017.8,第一負責人。(在建)
(12)跨既有濱綏線鐵路連續梁橋施工監控(32+48+32m鐵路連續梁橋),2012.5~2012.10,第一負責人。(已建)
(13)黑龍江省綏芬河市新華街立交橋(100+100m轉體施工斜拉橋)施工監控及成橋荷載試驗,建設時為國内轉體重量最大和轉體跨徑最大轉體施工斜拉橋,2005.5~2006.5,監控現場負責人。(已建)
(14)黑龍江省小綏芬河(單、雙線)特大橋(40+64+40m鐵路連續梁橋)施工監控,2013.5~2013.11,第一負責人。(已建)
(15)吉林省松原龍華松花江特大橋(65+5×100+65m剛構-連續組合梁橋)施工監控結構分析,2005.8~2007.10,技術負責人,負責結構分析。(已建)
(16)肇松松花江特大橋(75+5×120+75m剛構-連續組合梁橋)施工監控,2003.10~2005.9,技術負責人,負責結構分析。(已建)
(17)陶賴昭松花江特大橋(65+5×100+65m剛構-連續組合梁橋)施工監控結構分析。2000.07~2003.09,技術負責人,負責結構分析。(已建)
(18)長吉高速公路九站松花江特大橋(75+120+75m剛構-連續組合梁橋)模型試驗及荷載試驗結構分析、方案制定及現場荷載試驗,1997.7~1999.9,現場技術負責人。(已建)
★ 研究課題獲獎情況
(1)《吉林省九站松花江大橋模型試驗與結構分析》項目獲 2000年吉林省科技進步二等獎。完成項目的所有結構分析部分,第11名。
(2)《吉林省吉林至江密峰高速公路九站松花江特大公路大橋荷載試驗研究》項目獲2000年吉林省科技進步三等獎。完成項目所有結構分析及荷載試驗加載方案制定,第7名。
(3)《大跨度斜拉橋單點平鉸轉體設計與施工技術的研究》獲2007年黑龍江省科學技術進步二等獎,2006年黑龍江省城鄉建設科學技術進步一等獎,第4名,施工監控現場負責人。
(4)《四方台松花江大橋主橋索塔錨固區節段足尺模型試驗研究》獲2008年黑龍江省科學技術進步二等獎,第9名。
(5)《采用導師制方式加強土木工程專業學生綜合能力培養》,2005~2007年,獲2007年黑龍江省教學成果二等獎,2007年伟德BETVlCTOR1946校教學成果獎,第2名。
(6)《結構設計原理》獲2007年黑龍江省級精品建設課程,第4名。
(7)《結構設計原理》多媒體網絡課件獲“2007年全國第七屆多媒體課件大賽”三等獎,第2名。
(8)《先簡支後連續梁設計優化與施工技術的研究》項目獲2009年黑龍江省科學技術進步三等獎,第4名。
★完成如下技術服務項目
(1)吉林省延邊敦化至珲春高速下嘎公鐵立交橋14片35m箱梁靜載試驗檢測及計算工作。
(2)京哈公路蔡雙段拉林河大橋、烏金屯大橋橋梁驗算任務。
(3)哈爾濱市公濱立交橋異型橋梁設計、計算任務。
(4)松北太陽橋東西引橋設計計算任務。
(5)松花江公路大橋改建工程(加鋪的驗算工作)。
(6)哈爾濱市動力廣場綜合改擴建工程計算任務。
(7)國道主幹線哈爾濱繞城公路西段哈鐵公路橋、鋼筋混凝土中承式拱橋驗算任務。
(8)哈爾濱繞城高速公路松花江斜拉橋索塔錨固區節段分析及測試結果繪圖程序編制。
(9)浙江省嵊州市雙塔大橋施工圖設計文件審查計算任務。
(10)曹峨江大橋施工圖設計文件審查計算任務。
(11)浙江省諸永高速公路台州Ⅰ段白塔樞紐匝道初步設計。
(12)浙江省諸永高速公路金華段大山塢橋施工圖設計任務。
(13)浙江省諸永高速公路台州Ⅰ段白塔樞紐異型橋施工圖設計。
(14)綏芬河轉體施工斜拉橋施工監控結構分析、現場監控。
(15)黑龍江省慶安縣大橋、建虎高速公路、嫩黑公路等橋梁檢測及單梁試驗。
(16)福泉高速公路擴建工程(福州段)AK0+393.5A匝道2号橋3×20m、CK0+093莆田互通C匝道橋3×20m,福泉高速公路擴建工程(莆田段)AK0+225.40A匝道1号橋3×20m、PA3合同段YK319+136.3主線右線大橋第九聯3×25m異形橋配束計算、設計。
★ResearchProjectAward(personalawardcertificate)
★ Research Project Award (personal award certificate)
(1)Jilin JiuzhanSonghuaRiverBridgeModel Test and Structure Analysis wonJilinprovince science and technology progress the second prize in 2000. All the structural analysis parts of the project are concluded.
(2) Jilin Province Jilin to Jiangmifeng Expressway Jiuzhan Songhua River Large Highway Bridge Load Test Research Project won Jilin province science and technology progress the third prize in 2000. All the project structural analysis and load test loading program have been completed.
(3) Research on Large Span Cable-stayed Bridge Single Point Flat Hinge Swivel Design and Construction Technology won Heilongjiang province science and technology progress the second prize in 2007, won urban and rural construction in Heilongjiang province science and technology progress the first prize in 2006, construction monitoring site person in charge.
(4) Research on Sifangtai Songhua River Bridge Static Load Test of the Cable Tower Anchorage Zone Full-scale Model won Heilongjiang province science and technology progress the second prize in 2008.
(5) Research on Simple Supported to Continuous Girder Bridge Optimization Design and Construction Technology Project won Heilongjiang province science and technology progress the third prize in 2009.
★ Responsible for the Completion and under ConstructionBridgeConstruction Monitoring Project
(1) Construction monitoring on Fuyin expressway new Jiujiang Yangtze River Highway Bridge with the main span of 70+75+84+818+233.5+124.5m which is twin towers, double cable plane hybrid girder cable-stayed bridge, the bridge is the first bridge in Jiangxi Province, its span ranks 6 in the world among similar bridges that have been built and are under construction, 2012.3~2013.10, on-site structure analysis director. (Already built)
(2) Zhengzhou to Dengfeng fast-track reconstruction project Chaoyanggou Reservoir Bridge (main span of 58+118+188+108m corrugated steel web PC extradosed cable-stayed bridge, the bridge is the largest span cable-stayed bridge with corrugated steel webs) construction safety risk assessment, Wangjiazhuang Reservoir Bridge (main span 60+100+60m box girder variable cross-section) construction safety risk assessment, 2013.8~2013.11, the main director. (Under construction)
(3) ZhejiangQuzhouChangshanBridge(65+108+65m prestressed concrete extradosed cable-stayed bridge),PurpleHarbourBridge(40+65+40m prestressed concrete continuous girder bridge). Bridge construction monitoring and load test project director. 2010.5~2014.10, the main director. (Already built)
(4) Heilongjiang Shuangyashan Shuangsheng Road Anbang River cable-stayed bridge (70+70m with single tower and single cable plane wide box girder cable-stayed bridge) construction monitoring project and bridge load test, 2012.5~2013.9, the main director. (Already built)
(5) Guangdong Dongguan Mayong the second bridge (prestressed 46+80+46m concrete continuous rigid frame bridge) construction monitoring, 2011.8~2012.1, the main director. (Already built)
(6) Heihe city Heihe island large angle V-shaped support of butterfly arch continuous girder bridge (prestressed 51+53+53m concrete continuous girder bridge) construction monitoring, 2010.5~2010.11, 2010, the main director. (Already built)
(7) Construction monitoring on continuous beam bridge across Binsui railway (32+48+32m Railway Continuous Girder Bridge), 2012.5 ~ 2012.10, the main director. (Already built)
(8) Suifen River City, Heilongjiang Province, Xinhua Street overpass (100+100m swivel construction cable-stayed bridge) bridge construction monitoring and load test, the cable-stayed bridge of maximum weight and span in swivel construction for domestic, 2005.5 ~ 2006.5, On-site monitoring director. (Already built)
(9) Construction monitoring on the Small Suifen River(single, double line) extra large bridge (40+64+40m railway continuous girder bridge) in Heilongjiang Province, 2013.11~2013.5, the first person in charge. (Already built)
(10) Construction monitoring and structure analysis of the Songhua River special bridge (65+5×100+65m rigid frame continuous composite girder bridge) in Jilin Province, 2007.10~2005.8, technical director, responsible for structural analysis. (Already built)
(11) Construction monitoring onZhaosongSonghuaRiverBridge(75+5×120+120m rigid frame and continuous composite girder bridge), 2003.10~2005.9, technical director responsible for the structural analysis. (Already built)
(12) Construction monitoring and structure analysis of the Tao Laizhao Songhua River bridge (65+5×100+100m rigid frame continuous composite girder bridge). 2000.07~2003.09, technical director responsible for the structural analysis. (Already built)
(13) Model test and load test structure analysis, plan formulation and on-site load test of Changji expressway Jiuzhan Songhua River Bridge (75+120+75m rigid frame continuous composite girder bridge), 1997.7~1999.9, On-site technical director. (Already built)
★ The Finished Technical Service Projects
(1) 14 pieces of 35m box girder static load test and calculation work of Yanbian Dunhua to Hunchun expressway Xiaga railway overpass inJilin.
(2)Beijing to Harbin highway Caishuang section Lalin River Bridge, Wujintun Bridge calculation task.
(3) Design and calculation of the specialbridgeofGongbinoverpass inHarbin.
(4) The east and west approach design and calculation task ofSunBridgein Songbei.
(5) Reconstruction project of theSonghuariver highway (checking of the bridge paving).
(6) The calculation task of the comprehensive reform and extension project of Dongli square inHarbin.
(7) The calculation task ofHarbinrailway bridge and reinforced concrete half-through arch bridge of national main trunk line inHarbinbelt highway west section.
(8)Harbin belt expressway Songhua river cable-stayed bridge cable tower anchorage zone of segmental analysis and test results drawing program.
(9) Zhejiang Shengzhou twin towers bridge construction drawing design document review compution task.
(10) Cao'e river bridge construction drawing design document review and calculation task.
(11) Preliminary design of Baita hub ramp of Zhuyong expressway Taizhou section I inZhejiangprovince.
(12) Construction drawing design task of DashanwubridgeofZhuyongexpressway Jinhua section inZhejiangprovince.
(13) Construction drawing design of Baita hub special shapedbridgeofZhuyongexpressway Taizhou section I inZhejiangprovince.
(14) The analysis and site monitoring of swivel construction of cable-stayed bridge construction monitoring in Suifenhe.
(15) The bridge detection and single beam test of Qing'an county bridge, Jianhu expressway and Nenhei highway inHeilongjiangprovince.
(16) Fuquan expressway extension project (Fuzhou section) AK0+393.5 A ramp on the 2nd bridge of 3×20m, CK0+093 Putian interchange C ramp bridge of 3×20m, Fuquan expressway extension project (Putian section) AK0+225.40 A ramp on the 1st bridge of 3×20m, PA3 contract section YK319+136.3 right line on the 9th bridge of 3×25m special-shaped bridge with beam calculation and design.